Gretton School

15 Sep 2020

A specialist independent school in Cambridge.

Download case study

CLIENT: Gretton School, LXA Projects Ltd

BUILDING USE: STEAM block, providing two science labs, a design and technology workshop, art studio and associated services.

PROJECT DURATION: 34 Weeks (including COVID outbreak)

SIZE: 234m2

VALUE: £752k (excl.VAT)

‘’It was a pleasure to deliver this new academic facility in conjunction with Darwin Group. The team were flexible and responsive throughout the project and the end product is a fantastic new addition to Gretton School.’’

RICHARD PARTON, DIRECTOR OF LXA PROJECTS LTD