Greenhead College

21 Aug 2020

Sixth form centre set within stunning Yorkshire conservation area

Download case study

CLIENT: Greenhead College

BUILDING USE: 2 storey sixth form centre including science labs, classrooms and exam hall. The flexible design allowed the client to add an additional storey at a later date.

PROJECT DURATION: 24 Weeks

SIZE: 1,500m2

VALUE: £2.6m (excl.VAT)

Direct Award with PCSA

“Throughout the brief building process we found Darwin Group to be very efficient, reliable and customer friendly. We have been left with a classroom block to be proud of. Staff are delighted and amazed at the quality of the build and finish.”

JOHN BLAKE, COLLEGE BUSINESS MANAGER, GREENHEAD COLLEGE